Roof + solar

Should You Replace the Roof Before Solar?

Coordinate the roof and array once to reduce avoidable removal, reinstallation and flashing risk.

Current planning assumptions

Preliminary installed pricing is $2.60–$2.73 per watt under pricing version solar-retail-2026-09-v1. These are planning figures, not a final contract price.

Estimated export credit rates are illustrative and subject to retailer plan and micro-generation billing terms. Fixed, regulated, distribution and transmission charges may remain. Policy assumptions were last reviewed 2026-09-08.

Start with roof condition

Roof age alone is not the decision. Shingle condition, deck integrity, ventilation, flashing, penetrations, leak history and remaining service life should be reviewed before mounting equipment.

Avoid paying twice

Installing over a roof near replacement can introduce panel removal and reinstallation cost, scheduling complexity and responsibility gaps. Coordinated sequencing gives the roofing and solar scopes a shared property record.

Calgary weather details

Hail exposure, wind, freeze-thaw cycles and attic ventilation deserve attention. Attachment and flashing details must protect the roof system while electrical and interconnection requirements are planned.